Friday, April 29, 2011

Complete

I finally finished up with the solar panel installation yesterday morning. The two 80w panels to the left and a 55w panel on the right side.  All connect together in a combiner box,from there to the drain vent and down to the charge controller. I was going to run it down the refrigerator vent like most of these set-ups are but the drain vent was a shorter distance. I've got wire up the 750 amp inverter and I'm completely through with the project.  Went went Walmart for a couple of things,then late in the evening we did our walking.   

No comments: